REDES 2025

REDES 2025 proyecto

 

This project involved the configuration of R + D required for transmission and distribution networks in 2025.

The consortium was led by FUTURED, a Spanish association of companies involved in the electricity sector. The consortium consisted of 70 companies and research institutions whose research related to the electricity sector.

Grupo AIA’s role in the project was the development of an optimisation algorithm for energy storage, taking into account the different storage technologies (batteries, pumped hydro). The goal was to store the surplus of renewable energy and use it optimally.

The project ran from 2009 to 2010, with a possible extension to 2012.